Dual Rail Megasite
1,000 acres | Rochelle, Illinois

Top Site Advantages
All utilities on-site
Dual rail
Additional 500 acres for expansion
Zoned Industrial (I-3 Heavy Industrial); Boyle parcel is zoned agricultural (65 acres)
Free of wetlands & endangered species
Utilities
Electric
Site vetted to meet electric requirement of 100+MW with redundant service and access to 100% clean/renewable energy via solar field.
Gas
Site vetted to meet up to 200 mcfh at readily available 60 psig delivery pressure.
Water
Site vetted to meet water requirement of 1.5+ MGD.
Wastewater Infrastructure
Site vetted to meet wastewater requirement of 1.5+ MGD.
Broadband Connectivity
Fiber and broadband on-site.
Transportation & Logistic Assets
Proximity to Highways/Interstate
2 miles to I-88, I-39, and IL State Highway 251, all on 80,000lb truck routes
Dual Rail Access
BNSF & UP Class 1 railroads on-site
Proximity to Airport
3 miles to the Rochelle Municipal Airport (Koritz Field) with a 5,000' runway; Chicago-Rockford International Airport is 25 miles away; O'Hare International Airport is 75 miles away; and Midway Airport at 85 miles
Additional Details
Workforce
Labor Force: 514,068 (Mar 2023) Jobs: 432,116 (2022)
Local Incentives Available
Enterprise Zone, tax abatement, Underserved Area, REC zone
Address
Steward/Hayes Road
Rochelle, Illinois
(41.8834, -89.0177)

Target Industries
- Manufacturing
Number of Owners
Three (3)
Available Reports
- Geotechnical
- Phase I Environmental Study
Get In Touch
Interested in this vetted site? Let us know today!
"*" indicates required fields