Medina Plains
254 acres | Peoria, Illinois

Top Site Advantages
600 additional expandable acres
High water/wastewater compacity
Rail served site
Access to Chicago MSA workforce
Enterprise Zone & TIF district
Utilities
Electric
Site currently vetted to meet electric requirement of 5 MW with redundant service. Site vetted to meet electric requirement of 10 MW with ~1 year lead time and 50-100 MW with ~3-5 year lead time.
Gas
Site vetted to meet gas requirement of 50 mcfh at 10 psig with ~1-1.5 year lead time and 100 mcfh at 100 psig with 2-3 year lead time.
Water
Site vetted to meet water requirement of 1.5+ MGD.
Wastewater Infrastructure
Site vetted to meet wastewater requirement of 1.5+ MGD.
Broadband Connectivity
Broadband and fiber on-site.
Transportation & Logistic Assets
Proximity to Highways/Interstate
Adjacent to Route 6, 6 miles to I-74
Rail Served Site
On-site rail spur served by Union Pacific and Patriot Railway
Proximity to Airport
15.1 miles to Greater Peoria International Airport
Additional Details
Workforce
Labor Force (Mar 2024) | 1 Hour DT 4,372,065
Local Incentives Available
Enterprise Zone & TIF district
Address
3001 W Grand Parkway
Peoria, Illinois
(40.796537, -89.647120)

Target Industries
- Assembly
- Light Manufacturing
Number of Owners
Multiple
Available Reports
- Phase I Environmental
Divisable
Yes
Get In Touch
Interested in this vetted site? Let us know today!
"*" indicates required fields