Medina Plains
254 acres | Peoria, Illinois

Top Site Advantages
600 additional expandable acres
High water compacity
Rail served site
Access to Chicago MSA workforce
Enterprise zone & TIF district
Utilities
Electric
Site is vetted to currently meet electric requirement of 5MW with redundant service. Site vetted to meet electric requirement of 10 MW within 1 year, 50-100 MW within 3-5 years.
Gas
Site is vetted to meet gas requirement of 50 mcfh at 10psig within 1-1.5 years. Site vetted to meet gas requirement of 100 msfh at 100 psig within 2-3 years.
Water
Site is vetted to meet water requirement of 1.5+ MGD.
Wastewater Infrastructure
Site is vetted to meet wastewater requirement of 1.5+ MGD
Broadband Connectivity
Broadband and fiber onsite
Transportation & Logistic Assets
Proximity to Highways/Interstate
Adjacent to Route 6, 6 miles to I-74
Rail Served Site
Onsite rail spur served by Union Pacific and Patriot Railway
Proximity to Airport
15.1 miles to Greater Peoria International Airport
Additional Details
Workforce
Labor Force (Mar 2024) | 1 Hour DT 4,372,065
Local Incentives Available
Enterprise Zone & TIF district
Address
3001 W Grand Parkway
Peoria, Illinois
(40.796537, -89.647120)

Target Industries
- Assembly
- light manufacturing
Number of Owners
Multiple
Available Reports
- Phase I Environmental
Divisable
Yes