Back to Vetted Sites

Top Site Advantages

High connectivity—0.5 miles to I-80
3 miles to rail access served by CSX & CN
Flat topography
Outside of floodplain
Located in an Attainment Zone

Utilities

Electric

Site vetted to meet electric requirement of 5 MW with potential for redundant service. For loads 10+ MW installation of additional electrical infrastructure is required with ~30-42 month lead time.

Gas

Site vetted to meet gas requirement 100 mcfh at 60 psig delivery pressure. Higher delivery pressures would require upstream improvements.

Water

Water service not currently available at site.

Wastewater Infrastructure

Wastewater service not currently available at site.

Broadband Connectivity

Fiber on-site.

Transportation & Logistic Assets

Proximity to Highways/Interstate

.5 miles to I-80, .75 miles to Route 6

Rail

3 miles to CSX & Canadian National access

Proximity to Airport

4.7 miles to Morris Municipal Airport, 50 miles to Midway International Airport

Additional Details

Workforce

Labor Force (Nov 2024) | 1 Hour DT 3,034,803
Address

Brisbin Road
Morris, Illinois
(41.44, -88.37)

Grundy_County_Map_500x500
Target Industries
  • Manufacturing
  • Light Manufacturing
  • Transportation, Distribution, Logistics
Number of Owners

Single owner

Divisable

Yes

Get In Touch

Interested in this vetted site? Let us know today!