Back to Vetted Sites

Top Site Advantages

Rail on-site; interstate highway, rail, and barge logistical access
Zoned Heavy Industrial; entitled and ready
Additional 128-230 acres for expansion
Enterprise Zone, TIF district, Foreign-Trade Zone
Proximity to experienced and available workforce

Utilities

Electric

Site vetted to meet electric requirement of 10 MW with potential redundant service with ~18-24 month lead time from commitment and 100+ MW with ~3-5 year lead time.

Gas

Site vetted to meet gas requirement of 50 mcfh at normal delivery pressure 10 psig and 100 mcfh at 100 psig after upstream improvements.

Water

Site vetted to meet water requirement of 500,000 gpd and 1 MGD with lead time of ~1 year from commitment.

Wastewater Infrastructure

Site vetted to meet wastewater requirement of 500,000 GPD and 1.5+ MGD by 2027.

Broadband Connectivity

Fiber on-site.

Transportation & Logistic Assets

Proximity to Highways/Interstate

Adjacent to US-6, 2.5 miles to I-80 interchange

Rail Served Site

CSX Class 1

Proximity to Airport

80 miles to OHare International Airport, 72 miles to Central Illinois Regional Airport

Additional Details

Workforce

Labor Force (April 2024) | 1 Hour DT 782,096

Local Incentives Available

Enterprise Zone, TIF district, Foreign-Trade Zone
Address

1510 Warehouse Drive
Ottawa, Illinois
(41.3494, -88.7831)

LaSalle_County_Map_500x500
Target Industries
  • Manufacturing
  • Distribution
  • Magnesium & titanium-related manufacturing due to proximity to titanium metal powder producer
Number of Owners

Multiple—all willing to sell

Available Reports
  • Phase I Environmental
  • Geotechnical Report
  • Threatened & Endangered Species Study
  • Ancient Historical Artifact Study
  • Topographical Survey: Storm/Water

Get In Touch

Interested in this vetted site? Let us know today!