Top Site Advantages

Mainline, Class I rail adjacent
Environmentally remediated
All utilities on site
Publicly owned
Workforce availability

Utilities

Electric

Site is vetted to meet electric requirement of 10 MW within a 24-36 month timeline. For loads of of 50 MW+ a new service station requiring additional acreage and water detention would need to be constructed with an approximate timeline of 36-42 months.

Gas

Site is vetted to meet gas requirement of 200 MCF/hour

Water

Site vetted to meet water requirement of 200,000 GPD. For 1 MGD installation of an onsite ground reservoir and pump station is needed with a 2-3 year timeline.

Wastewater Infrastructure

Site vetted to meet wastewater requirement of 30,000 GPD. For 200,000 GPD+ upsizing of the pump station and force main are required with a 24-36 month timeline.  

Broadband Connectivity

Fiber on site

Transportation & Logistic Assets

Proximity to Highways/Interstate

3.5 miles to I-355

Rail

Mainline, Class I rail adjacent

Proximity to Airport

28 miles to Midway International Airport, 36 miles to O'Hare International Airport

Additional Details

Workforce

Labor Force (Mar 2024) | 1 Hour DT 8,068,299
Address

302 W 2nd Street
Lockport, Illinois
(41.59, -88.05)

Will_County_Map_500x500
Target Industries
  • Tech
  • Light manufacturing
Number of Owners

Publicly owned (single owner)

Available Reports
  • Phase I Environmental
  • IEPA Surface Water & Soil
Divisable

Yes