Star Innovation District
165 acres | Lockport, Illinois

Top Site Advantages
Mainline, Class I rail adjacent
Environmentally remediated
All utilities on site
Publicly owned
Workforce availability
Utilities
Electric
Site is vetted to meet electric requirement of 10 MW within a 24-36 month timeline. For loads of of 50 MW+ a new service station requiring additional acreage and water detention would need to be constructed with an approximate timeline of 36-42 months.
Gas
Site is vetted to meet gas requirement of 200 MCF/hour
Water
Site vetted to meet water requirement of 200,000 GPD. For 1 MGD installation of an onsite ground reservoir and pump station is needed with a 2-3 year timeline.
Wastewater Infrastructure
Site vetted to meet wastewater requirement of 30,000 GPD. For 200,000 GPD+ upsizing of the pump station and force main are required with a 24-36 month timeline.
Broadband Connectivity
Fiber on site
Transportation & Logistic Assets
Proximity to Highways/Interstate
3.5 miles to I-355
Rail
Mainline, Class I rail adjacent
Proximity to Airport
28 miles to Midway International Airport, 36 miles to O'Hare International Airport
Additional Details
Workforce
Labor Force (Mar 2024) | 1 Hour DT 8,068,299
Address
302 W 2nd Street
Lockport, Illinois
(41.59, -88.05)

Target Industries
- Tech
- Light manufacturing
Number of Owners
Publicly owned (single owner)
Available Reports
- Phase I Environmental
- IEPA Surface Water & Soil
Divisable
Yes